⎝⎛炸金花⎞⎠

Hello, welcome to the official website of Tai'an City Taishan Rongda Construction Technology Co., Ltd.!
塑料模壳

Product Categories

contact us

Tai'an Taishan Rongda Construction Technology Co., Ltd.

Contact: Manager Li

Mobile: 15662028866

Phone: 0538-8086567

Fax: 0538-8086567

Email: rongda567@163.com

Postcode: 271000

Website: xfbj444.com

Address: Great Wall Road, Tai'an City, Shandong Province

Tianlong International Building

Building formwork

Your current location : ⎝⎛炸金花⎞⎠ >> Products >> Turnover mold shell

Building formwork

  • 建筑模壳
  • Category: Turnover Mould

  • hit count:
  • Release Date: 2018/09/13
  • Online Inquiry
Detailed introduction

建筑模壳

Mold shell site installation

After the beam bottom mold is laid, the center line and the mold case control line are ejected, and a double-sided sponge strip is pasted along the mold case control line. Replace the warped formwork in time to avoid concrete leakage. Avoid spraying the release agent on the mold shell when painting the frame beam and the shear wall formwork release agent.

Concrete pouring

There is a quality problem caused by blasting molds, running molds or mold shell ruptures when pouring concrete, which will cause difficulties during the decoration phase. The pop-up and run-out phenomena that occur during the pouring process should be dealt with in a timely manner, and the mold shell blow-out and run-out parts should be pushed back to their original positions as far as possible.

After demoulding

Inspect the bottom plate of the mold shell, and use a dry hard cement paste to repair and smooth the partially damaged mold shell after wetting with water.

The plastic or glass fiber reinforced plastic is used to process the required mold shells according to the specifications of the ribbed floor slab, which has the characteristics of one-time molding and multiple-cycle use. At present, China's formwork is mainly made of glass fiber reinforced plastic and polypropylene plastic. It is equipped with support systems such as steel pillars (or door frames), steel (or wood) keels, angle steels (or wood supports), etc. The degree of industrialization has greatly increased.

URL of this article: http://xfbj444.com/product/619.html

Keywords: architectural formwork , plastic formwork , formwork

Recently Viewed:

    Tai'an Taishan Rongda Construction Technology Co., Ltd.

    Contact: Manager Li

    15662028866 Mobile: 15662028866

    Phone: 0538-8086567

    Website: xfbj444.com

    Address: Tianlong International Building, Changcheng Road, Tai'an City, Shandong Province

    泰安 菏泽 淄博 聊城 济宁 德州 滨州 枣庄 潍坊 Hot Products | Main Area: Jinan Taian Heze Zibo Liaocheng Jining Dezhou Binzhou Zaozhuang Weifang
  • online service
  • contact number
    15662028866
  • Leave message
  • Follow us
  • Online consultation
  • Online consultation
  • Welcome to leave us a message
    Please enter your message here, we will contact you as soon as possible.
    Name
    Contact person
    phone
    Landline / mobile number
    mailbox
    mailbox
    address
    address
    七乐彩 欢乐拼三张 炸金花 手机电玩平台